ITAC Assessment: DS0151
ITAC logo
ITAC Assessment: DS0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pre-Fabricated Building Components
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 85,335
ft2
Annual Production 109
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,482 374,560
kWh
Electricity Demand $4,199 1,200
kW-mo/yr
Electricity Fees $1,474 -
Natural Gas $14,741 3,241
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.1191: Change procedures / equipment / operating conditions $4,672 $192 $4,672
-
lb
-
02 4.212: Adopt in-house material generation $8,245 $4,500 - $8,245
03 4.812: Apply for investment incentives $709 $400 - $709
TOTAL RECOMMENDED $13,626 $5,092 $4,672
-
lb
$8,954
TOTAL IMPLEMENTED $5,381 $592 $4,672
-
lb
$709
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs