ITAC Assessment: BD0154
ITAC logo
ITAC Assessment: BD0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Roof bolts and Plates
NAICS
n/a
SIC 2439: Structural Wood Members, Not Elsewhere Classified
Sales Range n/a
# of Employees 100
Plant Area 60,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,698 1,917,351
kWh
Electricity Demand $74,488 6,457
kW-mo/yr
Electricity Fees $1,495 -
Natural Gas $214,342 32,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,576 $1,000 $3,362
99,648
kWh
$2,214
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $4,094 $1,000 $4,094
364,596
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,375 $260 $827
24,619
kWh
$548
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,042 $600 $613
18,171
kWh
$429
-
kW-mo/yr
- -
05 3.5248: Separate and recycle scrap metal to foundry or for sale $9,000 $1,000 - - $9,000
-
lb
-
06 4.441: Install automatic packing equipment $7,201 $4,500 - - - $7,201
07 4.821: Pay bills on time to avoid late fees $530 - - - - $530
TOTAL RECOMMENDED $28,818 $8,360 $8,896
507,034
kWh
$3,191
-
kW-mo/yr
$9,000
-
lb
$7,731
TOTAL IMPLEMENTED $18,670 $3,000 $7,456
464,244
kWh
$2,214
-
kW-mo/yr
$9,000
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs