Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MOLDED ALLOY TUBING
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area
n/a
Annual Production 7,000,000
lb
Production Hrs. Annual 3,840
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,856 751,465
kWh
Natural Gas $50,312 11,533
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,294 $7,780 $1,294
19,637
kWh
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,022 $400 - $1,022
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,215 $970 $2,548
39,273
kWh
- $(-333.0)
TOTAL RECOMMENDED $4,531 $9,150 $3,842
58,910
kWh
$1,022
-
MMBtu
$(-333.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs