Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

379

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hardwood veneer and plywood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0416 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $39,189 $227,490
UF0416 #05 Y:2008 Develop a repair/replace policy $5,057 -
UF0416 #04 Y:2008 Reduce the pressure of compressed air to the minimum required $5,217 -
UF0416 #03 Y:2008 Install timers and/or thermostats $53,629 $49,236
UF0416 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $70,300 $53,500
UF0416 #01 Y:2008 Repair faulty insulation in furnaces, boilers, etc $950 $4,000
MS0282 #07 Y:2005 Install timers and/or thermostats $1,059 $236
MS0282 #06 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,990 $203
MS0282 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $2,337 $7,721
MS0282 #04 Y:2005 Use most efficient type of electric motors $2,467 $4,140
MS0282 #03 Y:2005 Utilize energy-efficient belts and other improved mechanisms $6,573 $11,233
MS0282 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $10,947 $22,298
MS0282 #01 Y:2005 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $219,363 $472,500
OR0468 #12 Y:2004 Install equipment to move product $102,400 $242,000
OR0468 #11 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $14,650 $24,900
OR0468 #10 Y:2004 Turn off equipment when not in use $15,800 $26,600
OR0468 #09 Y:2004 Redesign flow to minimize mass transfer length $14,800 $15,700
OR0468 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $12,700 $13,800
OR0468 #07 Y:2004 Use most efficient type of electric motors $29,200 $27,800
OR0468 #06 Y:2004 Install occupancy sensors $3,200 $3,100