Assessment Year | 2005 |
---|---|
Principal Product | Veneer |
NAICS | 321211: Hardwood Veneer and Plywood Manufacturing |
SIC | 2435: Hardwood Veneer and Plywood |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
232,000
ft2
|
Annual Production | 5,700
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $147,982 | 3,318,084 |
kWh
|
$0.045 |
Electricity Demand | $34,329 | 10,654 |
kW-mo/yr
|
$3.22 |
Electricity Fees | $66,024 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $244,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $219,363 | $472,500 |
$311,155
6,991,920
kWh
|
$32,934
-
kW-mo/yr
|
$114,474 | $(-239,200.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,947 | $22,298 |
$7,245
169,126
kWh
|
$1,038
-
kW-mo/yr
|
$2,664 | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,573 | $11,233 |
$4,188
97,775
kWh
|
$802
-
kW-mo/yr
|
$1,583 | - | |
04 | 2.4133: Use most efficient type of electric motors | $2,467 | $4,140 |
$1,543
36,027
kWh
|
$332
-
kW-mo/yr
|
$592 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,337 | $7,721 |
$1,545
36,060
kWh
|
$224
-
kW-mo/yr
|
$568 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,990 | $203 |
$1,488
34,739
kWh
|
- | $502 | - | |
07 | 2.7261: Install timers and/or thermostats | $1,059 | $236 |
$792
18,498
kWh
|
- | $267 | - | |
TOTAL RECOMMENDED | $244,736 | $518,331 |
$327,956
7,384,145
kWh
|
$35,330
-
kW-mo/yr
|
$120,650 | $(-239,200.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs