Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,582

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Millwork, veneer, plywood, and structural wood
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0347 #12 Y:2026 Eliminate or reduce compressed air usage $245 -
IC0347 #11 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $601 $251
IC0347 #10 Y:2026 Recharge batteries on during off-peak demand periods $333 -
IC0347 #09 Y:2026 Use optimum size and capacity equipment $94 $507
IC0347 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $119 -
IC0347 #07 Y:2026 Install compressor air intakes in coolest locations $684 $760
IC0347 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,488 $400
IC0347 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,271 $747
IC0347 #04 Y:2026 Insulate feedwater tank $110 $429
IC0347 #03 Y:2026 Install / repair insulation on steam lines $1,008 $2,788
IC0347 #02 Y:2026 Insulate bare equipment $106 $193
IC0347 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,045 $2,274
OR0828 #06 Y:2026 Use solar heat to make electricty $56,750 $1,165,500
OR0828 #05 Y:2026 Use or replace with energy efficient substitutes $1,343,099 $12,894,700
OR0828 #04 Y:2026 Optimize plant power factor $2,860 $21,699
OR0828 #03 Y:2026 Modify process to reduce material use/cost $16,306 $10,000
OR0828 #02 Y:2026 Add equipment/ operators to reduce production bottleneck $12,537 $2,000
OR0828 #01 Y:2026 Eliminate or reduce compressed air usage $5,700 $50
OR0827 #07 Y:2026 Use solar heat to make electricty $34,776 $600,754
OR0827 #06 Y:2026 Optimize plant power factor $7,574 $55,435