2,557
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2602 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $61,576 | $37,084 |
n/a
|
| UW2602 #05 Y:2026 | 05 | 2026 | Repair and eliminate steam leaks | $38,800 | $7,287 |
n/a
|
| UW2602 #04 Y:2026 | 04 | 2026 | Use or replace with energy efficient substitutes | $10,764 | $32,940 |
n/a
|
| UW2602 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $20,293 | $15,688 |
n/a
|
| UW2602 #02 Y:2026 | 02 | 2026 | Utilize higher efficiency lamps and/or ballasts | $6,269 | $7,520 |
n/a
|
| UW2602 #01 Y:2026 | 01 | 2026 | Burn wood by-products for heat | $362,644 | $6,038,074 |
n/a
|
| OR0825 #05 Y:2026 | 05 | 2026 | Add equipment/ operators to reduce production bottleneck | $37,391 | $265,330 |
n/a
|
| OR0825 #04 Y:2026 | 04 | 2026 | Use most efficient type of electric motors | $5,237 | $1,136 |
n/a
|
| OR0825 #03 Y:2026 | 03 | 2026 | Eliminate or reduce compressed air usage | $1,412 | $163 |
n/a
|
| OR0825 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $3,425 | - |
n/a
|
| OR0825 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,124 | - |
n/a
|
| UC2517 #08 Y:2025 | 08 | 2025 | Utilize controls to operate equipment only when needed | $1,679 | $75 |
n/a
|
| UC2517 #07 Y:2025 | 07 | 2025 | Replace existing hvac unit with high efficiency model | $47,694 | $234,000 |
n/a
|
| UC2517 #06 Y:2025 | 06 | 2025 | Eliminate or reduce compressed air usage | $99 | - |
n/a
|
| UC2517 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $613 | $950 |
n/a
|
| UC2517 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $3,387 | - |
n/a
|
| UC2517 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $4,211 | $30,300 |
n/a
|
| UC2517 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,638 | $340 |
n/a
|
| UC2517 #01 Y:2025 | 01 | 2025 | Change rate schedules or other changes in utility service | $17,808 | - |
n/a
|
| UA0298 #11 Y:2025 | 11 | 2025 | Install occupancy sensors | $2,751 | $2,642 |
n/a
|