Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0021 #01 Y:2013 Flash condensate to produce lower pressure steam $209,585 $54,045
BS0012 #10 Y:2012 Insulate bare equipment $340 $2,905
BS0012 #09 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $14,916 $14,075
BS0012 #08 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,596 $6,725
BS0012 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,594 $26,100
BS0012 #06 Y:2012 Eliminate/reduce an operation $1,098 $422
BS0012 #05 Y:2012 Substitute compressed air cooling with water or air cooling $11,249 $3,500
BS0012 #04 Y:2012 Use / purchase optimum sized compressor $2,065 $8,525
BS0012 #03 Y:2012 Turn off equipment during breaks, reduce operating time $5,998 -
BS0012 #02 Y:2012 Turn off equipment when not in use $3,601 $8,272
BS0012 #01 Y:2012 Utilize controls to operate equipment only when needed $1,483 $900
BS0005 #06 Y:2012 Insulate bare equipment $11,990 $17,000
BS0005 #05 Y:2012 Install / repair insulation on steam lines $1,653 $7,846
BS0005 #04 Y:2012 Analyze flue gas for proper air/fuel ratio $15,615 $10,000
BS0005 #03 Y:2012 Turn off equipment when not in use $2,733 $178
BS0005 #02 Y:2012 Turn off equipment during breaks, reduce operating time $6,970 $609
BS0005 #01 Y:2012 Utilize controls to operate equipment only when needed $265 $555
OR0525 #05 Y:2007 Not found $1,300 $1,900
OR0525 #04 Y:2007 Not found $2,900 $6,400
OR0525 #03 Y:2007 Not found $5,000 $25,000