ITAC Assessment: BS0012
ITAC logo
ITAC Assessment: BS0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 160
Plant Area 352,939
ft2
Annual Production 250,000,000
thousand feet
Production Hrs. Annual 5,000
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,271,820 26,917,770
kWh
Electricity Demand $228,756 57,580
kW-mo/yr
Wood $528,450 1,004,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings
01 2.6231: Utilize controls to operate equipment only when needed $1,483 $900 $1,483
31,417
kWh
- -
02 2.6218: Turn off equipment when not in use $3,601 $8,272 $3,601
74,580
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $5,998 - $5,998
127,086
kWh
- -
04 2.4226: Use / purchase optimum sized compressor $2,065 $8,525 $1,848
39,328
kWh
$217
-
kW-mo/yr
-
05 2.4237: Substitute compressed air cooling with water or air cooling $11,249 $3,500 $11,249
253,300
kWh
- -
06 3.1161: Eliminate/reduce an operation $1,098 $422 $1,098
20,839
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,594 $26,100 $3,218
68,181
kWh
$376
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,596 $6,725 $2,324
49,248
kWh
$272
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,916 $14,075 $13,356
282,960
kWh
$1,560
-
kW-mo/yr
-
10 2.2511: Insulate bare equipment $340 $2,905 - - $340
-
MMBtu
TOTAL RECOMMENDED $46,940 $71,423 $44,176
946,939
kWh
$2,424
-
kW-mo/yr
$340
-
MMBtu
TOTAL IMPLEMENTED $14,676 $35,272 $14,300
301,264
kWh
$376
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs