ITAC Assessment: BS0005
ITAC logo
ITAC Assessment: BS0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Dimensional Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 259,705
ft2
Annual Production 350,000
thousand feet
Production Hrs. Annual 4,300
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $739,458 25,641,864
kWh
Electricity Demand $51,531 56,683
kW-mo/yr
Electricity Fees $261,483 -
Wood $924,788 1,004,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.6231: Utilize controls to operate equipment only when needed $265 $555 $265
9,039
kWh
-
02 2.6212: Turn off equipment during breaks, reduce operating time $6,970 $609 $6,970
243,278
kWh
-
03 2.6218: Turn off equipment when not in use $2,733 $178 $2,733
95,386
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $15,615 $10,000 - $15,615
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $1,653 $7,846 - $1,653
-
MMBtu
06 2.2511: Insulate bare equipment $11,990 $17,000 - $11,990
-
MMBtu
TOTAL RECOMMENDED $39,226 $36,188 $9,968
347,703
kWh
$29,258
-
MMBtu
TOTAL IMPLEMENTED $25,318 $10,788 $9,703
338,664
kWh
$15,615
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs