Assessment Year | 2012 |
---|---|
Principal Product | Dimensional Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
259,705
ft2
|
Annual Production | 350,000
thousand feet
|
Production Hrs. Annual | 4,300
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $739,458 | 25,641,864 |
kWh
|
$0.029 |
Electricity Demand | $51,531 | 56,683 |
kW-mo/yr
|
$0.91 |
Electricity Fees | $261,483 | - |
|
- |
Wood | $924,788 | 1,004,063 |
MMBtu
|
$0.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,226 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $265 | $555 |
$265
9,039
kWh
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,970 | $609 |
$6,970
243,278
kWh
|
- | |
03 | 2.6218: Turn off equipment when not in use | $2,733 | $178 |
$2,733
95,386
kWh
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,615 | $10,000 | - |
$15,615
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $1,653 | $7,846 | - |
$1,653
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $11,990 | $17,000 | - |
$11,990
-
MMBtu
|
|
TOTAL RECOMMENDED | $39,226 | $36,188 |
$9,968
347,703
kWh
|
$29,258
-
MMBtu
|
||
TOTAL IMPLEMENTED | $25,318 | $10,788 |
$9,703
338,664
kWh
|
$15,615
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs