Assessment Year | 1993 |
---|---|
Principal Product | FLOUR AND CORN TORTILLAS |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 28,000,000
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $37,793 | 340,856 |
kWh
|
$0.11 |
Natural Gas | $40,739 | 7,203 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,111 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $906 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $470 | $1,400 | - |
$470
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $513 | $1,050 | - |
$513
-
MMBtu
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $209 | $156 | - |
$209
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $156 | $156 |
$156
1,465
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33 | - |
$33
293
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $223 | $627 |
$223
2,052
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $65 | $102 |
$65
586
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $119 | - |
$119
1,172
kWh
|
- | - | |
09 | 2.4314: Use synthetic lubricant | $323 | - |
$53
586
kWh
|
- | $270 | |
TOTAL RECOMMENDED | $2,111 | $3,491 |
$649
6,154
kWh
|
$1,192
-
MMBtu
|
$270 | ||
TOTAL IMPLEMENTED | $906 | $1,308 |
$184
1,758
kWh
|
$722
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs