Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,936

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sawmills and planing mills, general
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0571 #09 Y:2018 Insulate bare equipment $1,597 $8,060
WV0571 #08 Y:2018 Develop a repair/replace policy $3,383 $763
WV0571 #07 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $4,135 $4,150
WV0571 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $5,044 -
WV0571 #05 Y:2018 Upgrade controls on compressors $5,475 $8,000
WV0571 #04 Y:2018 Replace obsolete burners with more efficient ones $11,713 $2,200
WV0571 #03 Y:2018 Analyze flue gas for proper air/fuel ratio $15,334 $3,500
WV0571 #02 Y:2018 Install occupancy sensors $17,040 $19,272
WV0571 #01 Y:2018 Establish a predictive maintenance program $21,112 $1,000
OR0708 #04 Y:2018 Use or replace with energy efficient substitutes $3,444 $8,480
OR0708 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $2,132 -
OR0708 #02 Y:2018 Optimize plant power factor $12,870 $46,694
OR0708 #01 Y:2018 Size electric motors for peak operating efficiency $40,920 $18,036
BS0112 #06 Y:2018 Utilize controls to operate equipment only when needed $3,051 $2,790
BS0112 #05 Y:2018 Turn off equipment when not in use $16,656 $1,031
BS0112 #04 Y:2018 Install occupancy sensors $1,785 $1,560
BS0112 #03 Y:2018 Eliminate or reduce compressed air usage $9,787 $13,000
BS0112 #02 Y:2018 Install compressor air intakes in coolest locations $13,971 $2,145
BS0112 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $38,983 $1,500
OK0990 #05 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $1,502 $378