ITAC Assessment: WV0571
ITAC logo
ITAC Assessment: WV0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wood Products
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 250,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $279,928 4,143,686
kWh
Electricity Demand $132,372 13,587
kW-mo/yr
Electricity Fees $8,974 -
Natural Gas $15,826 1,835
MMBtu
Wood $360,000 192,000
MMBtu
TOTAL YEARLY COSTS $797,100
RECOMMENDED SAVINGS* $84,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
01 2.4157: Establish a predictive maintenance program $21,112 $1,000 $13,695
202,592
kWh
$9,467
-
kW-mo/yr
- $(-2,050.0)
02 2.7135: Install occupancy sensors $17,040 $19,272 $10,066
148,907
kWh
$6,974
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $15,334 $3,500 - - $15,484
-
MMBtu
$(-150.0)
04 2.1221: Replace obsolete burners with more efficient ones $11,713 $2,200 - - $11,713
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $5,475 $8,000 $5,475
80,998
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,044 - $2,993
44,291
kWh
$2,051
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,135 $4,150 $4,135
61,169
kWh
- - -
08 2.4151: Develop a repair/replace policy $3,383 $763 $2,234
33,041
kWh
$1,549
-
kW-mo/yr
- $(-400.0)
09 2.2511: Insulate bare equipment $1,597 $8,060 - - $1,597
-
MMBtu
-
TOTAL RECOMMENDED $84,833 $46,945 $38,598
570,998
kWh
$20,041
-
kW-mo/yr
$28,794
-
MMBtu
$(-2,600.0)
TOTAL IMPLEMENTED $63,510 $32,595 $28,988
428,831
kWh
$20,041
-
kW-mo/yr
$17,081
-
MMBtu
$(-2,600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs