ITAC Assessment: OK0990
ITAC logo
ITAC Assessment: OK0990
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product wood lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 183,189
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,666 7,726,425
kWh
Waste Disposal Costs
Water Usage $31,069 6,366
Tgal
TOTAL YEARLY COSTS $438,735
RECOMMENDED SAVINGS* $64,608 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,055

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $11,191 $20,591 - $11,191
02 2.7142: Utilize higher efficiency lamps and/or ballasts $774 $2,329 $774
14,891
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,553 $7,440 $3,553
68,328
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,588 $15,600 $47,588
915,146
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,502 $378 $1,502
28,882
kWh
-
TOTAL RECOMMENDED $64,608 $46,338 $53,417
1,027,247
kWh
$11,191
TOTAL IMPLEMENTED $5,055 $7,818 $5,055
97,210
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs