Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hats, caps, and millinery
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0628 #12 Y:2025 Improve space comfort conditioning $4,645 $1,476
UF0628 #11 Y:2025 Improve space comfort conditioning $141,216 $3,660
UF0628 #10 Y:2025 Install compressor air intakes in coolest locations $514 $1,235
UF0628 #09 Y:2025 Improve air circulation with destratification fans / other methods $1,115 $1,235
UF0628 #08 Y:2025 Upgrade controls on compressors $2,783 $6,000
UF0628 #07 Y:2025 Minimize condenser cooling water temperature $3,937 $18,930
UF0628 #06 Y:2025 Eliminate or reduce compressed air usage $3,938 -
UF0628 #05 Y:2025 Upgrade obsolete equipment $4,580 $16,608
UF0628 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,671 $41,856
UF0628 #03 Y:2025 Utilize controls to operate equipment only when needed $12,464 $25,640
UF0628 #02 Y:2025 Use demand controller or load shedder $43,459 $43,906
UF0628 #01 Y:2025 Use solar heat to make electricty $45,801 $322,608
LE0462 #05 Y:2018 Utilize higher efficiency lamps and/or ballasts $4,454 $24,417
LE0462 #04 Y:2018 Install compressor air intakes in coolest locations $1,005 $2,000
LE0462 #03 Y:2018 Utilize energy-efficient belts and other improved mechanisms $226 $355
LE0462 #02 Y:2018 Preheat boiler makeup water with waste process heat $15,808 $20,000
LE0462 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $2,915 $1,000
MO0281 #09 Y:2000 Use less toxic and volatile solvent substitutes $131 -
MO0281 #08 Y:2000 Install equipment to move product $14,183 $2,580
MO0281 #07 Y:2000 Begin a practice of predictive / preventative maintenance $18,160 $3,700