Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Men's and boys' shirts, except work shirts
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0264 #10 Y:2003 Install timers and/or thermostats $1,393 $350
NC0264 #09 Y:2003 Reduce the pressure of compressed air to the minimum required $264 $100
NC0264 #08 Y:2003 Meter recycled water (to reduce sewer charges) $160 $280
NC0264 #07 Y:2003 Increase amount of waste recovered for resale $1,875 $500
NC0264 #06 Y:2003 Insulate bare equipment $152 $627
NC0264 #05 Y:2003 Recover waste heat from equipment $463 $800
NC0264 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $454 $630
NC0264 #03 Y:2003 Avoid introducing hot, humid, or dirty air into hvac system $1,182 $3,115
NC0264 #02 Y:2003 Avoid introducing hot, humid, or dirty air into hvac system $743 $3,100
NC0264 #01 Y:2003 Install occupancy sensors $126 $357
NC0195 #07 Y:2000 Use waste heat from flue gases to heat space conditioning air $4,632 $7,499
NC0195 #06 Y:2000 Utilize energy-efficient belts and other improved mechanisms $3,675 $50
NC0195 #05 Y:2000 Make a practice of turning off lights when not needed $6,839 $3,180
NC0195 #04 Y:2000 Utilize higher efficiency lamps and/or ballasts $2,637 $7,260
NC0195 #03 Y:2000 Disconnect ballasts $7,600 $6,350
NC0195 #02 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $7,306 $300
NC0195 #01 Y:2000 Use waste heat from hot flue gases to preheat $150,957 $214,000
ME0276 #08 Y:1999 Use most efficient type of electric motors $273 $994
ME0276 #07 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $419 $300
ME0276 #06 Y:1999 Insulate bare equipment $520 $382