Assessment Year | 2000 |
---|---|
Principal Product | Denim fabric |
NAICS |
n/a
|
SIC | 2321: Men's and Boys' Shirts, Except Work Shirts |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
300,000
ft2
|
Annual Production | 45,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $529,790 | 22,447,832 |
kWh
|
$0.024 |
Electricity Demand | $650,320 | 40,306 |
kW-mo/yr
|
$16.13 |
Electricity Fees | $62,145 | - |
|
- |
Natural Gas | $607,782 | 128,616 |
MMBtu
|
$4.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $183,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $172,702 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $150,957 | $214,000 |
$(-1,147.0)
(-48,652)
kWh
|
$(-1,119.0)
-
kW-mo/yr
|
$158,516
-
MMBtu
|
$(-5,293.0)
-
Tgal
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,306 | $300 |
$3,785
160,317
kWh
|
$3,521
-
kW-mo/yr
|
- | - | |
03 | 2.7122: Disconnect ballasts | $7,600 | $6,350 |
$3,938
167,057
kWh
|
$3,662
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,637 | $7,260 |
$734
31,067
kWh
|
$1,903
-
kW-mo/yr
|
- | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $6,839 | $3,180 |
$3,648
154,748
kWh
|
$3,191
-
kW-mo/yr
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,675 | $50 |
$1,904
80,598
kWh
|
$1,771
-
kW-mo/yr
|
- | - | |
07 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $4,632 | $7,499 |
$(-59.0)
(-2,345)
kWh
|
- |
$4,691
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $183,646 | $238,639 |
$12,803
542,790
kWh
|
$12,929
-
kW-mo/yr
|
$163,207
-
MMBtu
|
$(-5,293.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $172,702 | $223,830 |
$10,224
433,470
kWh
|
$9,255
-
kW-mo/yr
|
$158,516
-
MMBtu
|
$(-5,293.0)
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs