ITAC Assessment: LS2214
ITAC logo
ITAC Assessment: LS2214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range less than $500
k
# of Employees 4
Plant Area 760,200
ft2
Annual Production 286,000
ton
Production Hrs. Annual 1,820
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,175 723,500
kWh
Electricity Demand $11,272 2,736
kW-mo/yr
Natural Gas $199,293 29,345
MMBtu
TOTAL YEARLY COSTS $266,740
RECOMMENDED SAVINGS* $58,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $137 - $137
1,769
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,189 $270 $3,189
41,073
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $226 $25 $226
2,909
kWh
- -
04 2.7261: Install timers and/or thermostats $217 $38 $217
2,793
kWh
- -
05 4.661: Level zero – install control systems for existing equipment $53,187 $50,000 - - $53,187
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,374 $1,394 $1,157
14,902
kWh
$217
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $63 $150 $63
806
kWh
- -
TOTAL RECOMMENDED $58,393 $51,877 $4,989
64,252
kWh
$217
-
kW-mo/yr
$53,187
TOTAL IMPLEMENTED $56,730 $50,308 $3,543
45,635
kWh
- $53,187
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings