Assessment Year | 2022 |
---|---|
Principal Product | Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | less than $500 k |
# of Employees | 4 |
Plant Area |
760,200
ft2
|
Annual Production | 286,000
ton
|
Production Hrs. Annual | 1,820
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,175 | 723,500 |
kWh
|
$0.078 |
Electricity Demand | $11,272 | 2,736 |
kW-mo/yr
|
$4.12 |
Natural Gas | $199,293 | 29,345 |
MMBtu
|
$6.79 |
TOTAL YEARLY COSTS | $266,740 | |||
RECOMMENDED SAVINGS* | $58,393 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,730 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $137 | - |
$137
1,769
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,189 | $270 |
$3,189
41,073
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $226 | $25 |
$226
2,909
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $217 | $38 |
$217
2,793
kWh
|
- | - | |
05 | 4.661: Level zero – install control systems for existing equipment | $53,187 | $50,000 | - | - | $53,187 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,374 | $1,394 |
$1,157
14,902
kWh
|
$217
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $63 | $150 |
$63
806
kWh
|
- | - | |
TOTAL RECOMMENDED | $58,393 | $51,877 |
$4,989
64,252
kWh
|
$217
-
kW-mo/yr
|
$53,187 | ||
TOTAL IMPLEMENTED | $56,730 | $50,308 |
$3,543
45,635
kWh
|
- | $53,187 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs