ITAC Assessment: NC0264
ITAC logo
ITAC Assessment: NC0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Men's Dress Shirts
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 55,000
ft2
Annual Production 360,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,591 1,279,260
kWh
Electricity Demand $45,226 5,373
kW-mo/yr
Electricity Fees $3,542 -
Fuel Oil #1 $10,393 1,220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,812 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $126 $357 $126
3,706
kWh
- - - - -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $743 $3,100 $482
14,145
kWh
$261
-
kW-mo/yr
- - - -
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $1,182 $3,115 $810
23,763
kWh
$372
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $454 $630 $183
5,838
kWh
$271
-
kW-mo/yr
- - - -
05 2.2437: Recover waste heat from equipment $463 $800 - - - $463
-
MMBtu
- -
06 2.2511: Insulate bare equipment $152 $627 $24
708
kWh
$38
-
kW-mo/yr
$90
-
MMBtu
- - -
07 3.5313: Increase amount of waste recovered for resale $1,875 $500 - - - - $1,875
-
lb
-
08 3.4116: Meter recycled water (to reduce sewer charges) $160 $280 - - - - - $160
09 2.4231: Reduce the pressure of compressed air to the minimum required $264 $100 $107
3,140
kWh
$157
-
kW-mo/yr
- - - -
10 2.7261: Install timers and/or thermostats $1,393 $350 $1,393
40,861
kWh
- - - - -
TOTAL RECOMMENDED $6,812 $9,859 $3,125
92,161
kWh
$1,099
-
kW-mo/yr
$90
-
MMBtu
$463
-
MMBtu
$1,875
-
lb
$160
TOTAL IMPLEMENTED $1,999 $1,607 $1,600
47,407
kWh
$309
-
kW-mo/yr
$90
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings