Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,441

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Apparel and other finished products made from fabrics and similar materials
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2503 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,701 $2,100
UF0628 #12 Y:2025 Improve space comfort conditioning $4,645 $1,476
UF0628 #11 Y:2025 Improve space comfort conditioning $141,216 $3,660
UF0628 #10 Y:2025 Install compressor air intakes in coolest locations $514 $1,235
UF0628 #09 Y:2025 Improve air circulation with destratification fans / other methods $1,115 $1,235
UF0628 #08 Y:2025 Upgrade controls on compressors $2,783 $6,000
UF0628 #07 Y:2025 Minimize condenser cooling water temperature $3,937 $18,930
UF0628 #06 Y:2025 Eliminate or reduce compressed air usage $3,938 -
UF0628 #05 Y:2025 Upgrade obsolete equipment $4,580 $16,608
UF0628 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $10,671 $41,856
UF0628 #03 Y:2025 Utilize controls to operate equipment only when needed $12,464 $25,640
UF0628 #02 Y:2025 Use demand controller or load shedder $43,459 $43,906
UF0628 #01 Y:2025 Use solar heat to make electricty $45,801 $322,608
UL2502 #08 Y:2025 Use computer programs to optimize hvac performance $8,276 $1,800
UL2502 #07 Y:2025 Use solar heat to make electricty $74,556 $570,771
UL2502 #06 Y:2025 Reduce illumination to minimum necessary levels $3,639 -
UL2502 #05 Y:2025 Install occupancy sensors $753 $155
UL2502 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $94 $35
UL2502 #03 Y:2025 Optimize plant power factor $2,331 $7,280
UL2502 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $1,066 -