| Assessment Year | 2025 |
|---|---|
| Principal Product | Tarps and Tents |
| NAICS | 314910: Textile Bag and Canvas Mills |
| SIC | 2394: Canvas and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 275 |
| Plant Area |
275,000
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $59,269 | 1,142,912 |
kWh
|
$0.052 |
| Electricity Demand | $141,664 | 5,813 |
kW-mo/yr
|
$24.37 |
| Electricity Fees | $34,134 | - |
|
- |
| Natural Gas | $36,012 | 1,603 |
MMBtu
|
$22.47 |
| TOTAL YEARLY COSTS | $271,078 | |||
| RECOMMENDED SAVINGS* | $98,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,810 | $2,205 |
$7,810
150,607
kWh
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,066 | - |
$1,066
20,534
kWh
|
- | - | - | |
| 03 | 2.3212: Optimize plant power factor | $2,331 | $7,280 | - | - | $2,331 | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $94 | $35 |
$40
774
kWh
|
$54
-
kW-mo/yr
|
- | - | |
| 05 | 2.7135: Install occupancy sensors | $753 | $155 |
$753
14,524
kWh
|
- | - | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $3,639 | - |
$1,545
29,786
kWh
|
$2,094
-
kW-mo/yr
|
- | - | |
| 07 | 2.9114: Use solar heat to make electricty | $74,556 | $570,771 |
$38,466
741,758
kWh
|
$36,090
-
kW-mo/yr
|
- | - | |
| 08 | 2.7226: Use computer programs to optimize hvac performance | $8,276 | $1,800 |
$2,279
43,946
kWh
|
- | - |
$5,997
-
MMBtu
|
|
| TOTAL RECOMMENDED | $98,525 | $582,246 |
$51,959
1,001,929
kWh
|
$38,238
-
kW-mo/yr
|
$2,331 |
$5,997
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs