Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Coated fabrics, not rubberized
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0599 #09 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $627 $600
MA0599 #08 Y:2005 Reduce fluid flow rates $2,270 $600
MA0599 #07 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $3,051 $7,865
MA0599 #06 Y:2005 Preheat combustion air with waste heat $4,260 $1,190
MA0599 #05 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $5,780 $12,325
MA0599 #04 Y:2005 Insulate bare equipment $10,010 $5,280
MA0599 #03 Y:2005 Re-use or recycle hot or cold process exhaust air $17,205 $10,250
MA0599 #02 Y:2005 Insulate bare equipment $20,495 $3,700
MA0599 #01 Y:2005 Recover waste heat from equipment $89,422 $172,300
MA0571 #07 Y:2004 Optimize plant power factor $735 $1,450
MA0571 #06 Y:2004 Improve air circulation with destratification fans / other methods $2,702 $1,962
MA0571 #05 Y:2004 Replace electrically-operated equipment with fossil fuel equipment $6,826 $29,170
MA0571 #04 Y:2004 Use minimum safe oven ventilation $7,370 $1,900
MA0571 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $14,977 $25,856
MA0571 #02 Y:2004 Recover waste heat from equipment $46,372 $49,355
MA0571 #01 Y:2004 Use or replace with energy efficient substitutes $97,224 $319,500
MA0108 #07 Y:1987 Install timers and/or thermostats $9,195 $340
MA0108 #06 Y:1987 Minimize use of outside make-up air for ventilation except when used for economizer cycle $11,043 $1,235
MA0108 #05 Y:1987 Optimize plant power factor $39,146 $80,000
MA0108 #04 Y:1987 Use most efficient type of electric motors $4,121 $12,244