ITAC Assessment: MA0108
ITAC logo
ITAC Assessment: MA0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTO. FABRIC ROLL GOODS
NAICS
n/a
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 30,000
thousand feet
Production Hrs. Annual 5,798
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,701 8,281,067
kWh
Natural Gas $371,227 64,557
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,044 - $10,044
130,422
kWh
-
02 2.2511: Insulate bare equipment $4,311 $9,576 - $4,311
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,645 $387 $2,645
34,291
kWh
-
04 2.4133: Use most efficient type of electric motors $4,121 $12,244 $4,121
53,634
kWh
-
05 2.3212: Optimize plant power factor $39,146 $80,000 $39,146
-
kWh
-
06 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $11,043 $1,235 $284
3,810
kWh
$10,759
-
MMBtu
07 2.7261: Install timers and/or thermostats $9,195 $340 - $9,195
-
MMBtu
TOTAL RECOMMENDED $80,505 $103,782 $56,240
222,157
kWh
$24,265
-
MMBtu
TOTAL IMPLEMENTED $55,956 $92,631 $55,956
218,347
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs