ITAC Assessment: MA0571
ITAC logo
ITAC Assessment: MA0571
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Laminated barrier fabric
NAICS 313320: Fabric Coating Mills
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 50,950
ft2
Annual Production 9,000
thousand feet
Production Hrs. Annual 5,620
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,205 2,460,000
kWh
Electricity Demand $35,399 7,764
kW-mo/yr
Electricity Fees $1,077 -
Natural Gas $251,654 34,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $97,224 $319,500 - - $97,224
-
MMBtu
02 2.2437: Recover waste heat from equipment $46,372 $49,355 $(-2,693.0)
(-31,400)
kWh
- $49,065
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,977 $25,856 $14,977
172,600
kWh
- -
04 2.2212: Use minimum safe oven ventilation $7,370 $1,900 - - $7,370
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,826 $29,170 $8,109
94,400
kWh
$1,374
-
kW-mo/yr
$(-2,657.0)
-
MMBtu
06 2.7243: Improve air circulation with destratification fans / other methods $2,702 $1,962 $(-232.0)
(-2,700)
kWh
$(-29.0)
-
kW-mo/yr
$2,963
-
MMBtu
07 2.3212: Optimize plant power factor $735 $1,450 - $735
-
kW-mo/yr
-
TOTAL RECOMMENDED $176,206 $429,193 $20,161
232,900
kWh
$2,080
-
kW-mo/yr
$153,965
-
MMBtu
TOTAL IMPLEMENTED $75,545 $106,281 $20,393
235,600
kWh
$1,374
-
kW-mo/yr
$53,778
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs