matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2508 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $36,405 | $305,296 |
n/a
|
UL2508 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $3,751 | $375 |
n/a
|
UL2508 #07 Y:2025 | 07 | 2025 | Use waste heat from hot flue gases to preheat | $43,597 | $30,000 |
n/a
|
UL2508 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $55 | $237 |
n/a
|
UL2508 #05 Y:2025 | 05 | 2025 | Install spectral reflectors / delamp | $141 | - |
n/a
|
UL2508 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $3,012 | $3,773 |
n/a
|
UL2508 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,829 | $840 |
n/a
|
UL2508 #02 Y:2025 | 02 | 2025 | Replace existing equipment with more suitable substitutes | $53,908 | $84,265 |
n/a
|
UL2508 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $25,350 | $14,859 |
n/a
|
LS2506 #08 Y:2024 | 08 | 2024 | Replace existing hvac unit with high efficiency model | $7,930 | $80,003 |
n/a
|
LS2506 #07 Y:2024 | 07 | 2024 | Use solar heat to make electricty | $51,703 | $514,800 |
n/a
|
LS2506 #06 Y:2024 | 06 | 2024 | Consider power loss as well as initial loads and load growth in down-sizing transformers | $3,451 | $15,964 |
n/a
|
LS2506 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $5,396 | $9,990 |
n/a
|
LS2506 #04 Y:2024 | 04 | 2024 | Improve combustion control capability | $24,849 | $20,250 |
n/a
|
LS2506 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $427 | $50 |
n/a
|
LS2506 #02 Y:2024 | 02 | 2024 | Install occupancy sensors | $4,511 | $500 |
n/a
|
LS2506 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,596 | $135 |
n/a
|
LS2419 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $38,616 | $514,800 | |
LS2419 #04 Y:2024 | 04 | 2024 | Upgrade obsolete equipment | $56,850 | $580,000 | |
LS2419 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $7,609 | $51,689 |