Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous textile goods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1085 #09 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,175 $3,294
UD1085 #08 Y:2024 Use waste heat from hot flue gases to preheat $4,403 $20,475
UD1085 #07 Y:2024 Use waste heat from hot flue gases to preheat $13,159 $20,475
UD1085 #06 Y:2024 Turn off equipment when not in use $58,447 -
UD1085 #05 Y:2024 Meter recycled water (to reduce sewer charges) $3,170 $760
UD1085 #04 Y:2024 Eliminate or reduce compressed air usage $168 $52
UD1085 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,452 $1,235
UD1085 #02 Y:2024 Turn off equipment when not in use $7,415 -
UD1085 #01 Y:2024 Turn off equipment during breaks, reduce operating time $6,525 -
UD0415 #06 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,514 $3,200
UD0415 #05 Y:1993 Utilize higher efficiency lamps and/or ballasts $1,263 $5,400
UD0415 #04 Y:1993 Utilize higher efficiency lamps and/or ballasts $4,314 $31,350
UD0415 #03 Y:1993 Establish burner maintenance schedule for boilers $200,000 $480,000
UD0415 #02 Y:1993 Remove or close off unneeded compressed air lines $8,020 $3,000
UD0415 #01 Y:1993 Use demand controller or load shedder $7,569 -
UD0312 #10 Y:1990 Use waste heat from hot flue gases to preheat $58,168 $100,000
UD0312 #09 Y:1990 Repair and eliminate steam leaks $24,995 -
UD0312 #08 Y:1990 Install timers and/or thermostats $21,868 $12,000
UD0312 #07 Y:1990 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,775 $5,000
UD0312 #06 Y:1990 Preheat boiler makeup water with waste process heat $8,884 -