Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Thread mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0450 #08 Y:2017 Use / purchase optimum sized compressor $5,463 $22,000
LE0450 #07 Y:2017 Utilize higher efficiency lamps and/or ballasts $9,643 $36,750
LE0450 #06 Y:2017 Preheat boiler makeup water with waste process heat $3,038 $8,000
LE0450 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $1,186 $2,470
LE0450 #04 Y:2017 Install occupancy sensors $1,023 $1,625
LE0450 #03 Y:2017 Use optimum size and capacity equipment $2,802 $3,000
LE0450 #02 Y:2017 Install adequate dryers on air lines to eliminate blowdown $16,243 $8,000
LE0450 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $11,167 $1,000
NC0608 #08 Y:2017 Minimize condenser cooling water temperature $29,926 $2,000
NC0608 #07 Y:2017 Install outside air damper / economizer on hvac unit $100,563 $75,000
NC0608 #06 Y:2017 Reduce the pressure of compressed air to the minimum required $8,597 $100
NC0608 #05 Y:2017 Upgrade controls on compressors $7,353 $15,000
NC0608 #04 Y:2017 Eliminate or reduce compressed air usage $241 $675
NC0608 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $7,681 $200
NC0608 #02 Y:2017 Install occupancy sensors $566 $894
NC0608 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $49,355 $165,749
NC0357 #05 Y:2006 Change rate schedules or other changes in utility service $277 $100
NC0357 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,527 $4,761
NC0357 #03 Y:2006 Develop a repair/replace policy $699 $375
NC0357 #02 Y:2006 Clean and maintain refrigerant condensers and towers $16,558 $5,600