ITAC Assessment: LE0450
ITAC logo
ITAC Assessment: LE0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Silver coated threads
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2284: Thread Mills
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 65,000
ft2
Annual Production 8,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,445 4,402,100
kWh
Electricity Demand $58,651 8,440
kW-mo/yr
Natural Gas $86,098 14,595
MMBtu
TOTAL YEARLY COSTS $332,194
RECOMMENDED SAVINGS* $50,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,167 $1,000 $9,138
212,511
kWh
$2,029
-
kW-mo/yr
- -
02 2.4222: Install adequate dryers on air lines to eliminate blowdown $16,243 $8,000 $(-3,757.0)
(-87,360)
kWh
- - $20,000
03 2.4323: Use optimum size and capacity equipment $2,802 $3,000 $2,802
65,170
kWh
- - -
04 2.7135: Install occupancy sensors $1,023 $1,625 $1,023
23,795
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,186 $2,470 $971
22,574
kWh
$215
-
kW-mo/yr
- -
06 2.2441: Preheat boiler makeup water with waste process heat $3,038 $8,000 - - $3,038
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,643 $36,750 $7,892
183,546
kWh
$1,751
-
kW-mo/yr
- -
08 2.4226: Use / purchase optimum sized compressor $5,463 $22,000 $4,469
103,932
kWh
$994
-
kW-mo/yr
- -
TOTAL RECOMMENDED $50,565 $82,845 $22,538
524,168
kWh
$4,989
-
kW-mo/yr
$3,038
-
MMBtu
$20,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs