Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Capital Equipment for Semiconductor Industry
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 325
Plant Area 152,000
ft2
Annual Production 23,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,716 8,729,191
kWh
Electricity Demand $46,981 16,911
kW-mo/yr
Electricity Fees $47,151 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $791 $2,613 $480
12,016
kWh
$311
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,106 $60 $603
38,687
kWh
$1,503
-
kW-mo/yr
- - -
03 3.6192: Use a less expensive method of waste removal $6,136 $60 - - $6,136
-
lb
- -
04 3.4115: Recover and reuse cooling water $1,500 $3,000 $(-890.0)
(-22,860)
kWh
- - $2,390
-
Tgal
-
05 4.812: Apply for investment incentives $2,851 $60 - - - - $2,851
TOTAL RECOMMENDED $13,384 $5,793 $193
27,843
kWh
$1,814
-
kW-mo/yr
$6,136
-
lb
$2,390
-
Tgal
$2,851
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs