Assessment Year | 2010 |
---|---|
Principal Product | Pipe threads |
NAICS | 332996: Fabricated Pipe and Pipe Fitting Manufacturing |
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
54,500
ft2
|
Annual Production | 11,400
pieces
|
Production Hrs. Annual | 4,660
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,728 | 2,091,430 |
kWh
|
$0.051 |
Electricity Demand | $30,639 | 5,538 |
kW-mo/yr
|
$5.53 |
Electricity Fees | $14,687 | - |
|
- |
Natural Gas | $3,247 | 243 |
MMBtu
|
$13.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $33,500 | $1,800 |
$33,500
523,000
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,500 | $9,155 |
$12,100
188,400
kWh
|
$3,400
-
kW-mo/yr
|
- | |
03 | 2.3212: Optimize plant power factor | $6,410 | $21,100 | - |
$6,410
-
kW-mo/yr
|
- | |
04 | 2.7145: Install skylights | $4,470 | $14,200 |
$4,470
69,850
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,980 | $17 |
$1,550
24,200
kWh
|
$430
-
kW-mo/yr
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,660 | $300 |
$1,300
20,400
kWh
|
$360
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,600 | $3,460 |
$1,250
19,600
kWh
|
$350
-
kW-mo/yr
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $1,560 | $265 |
$1,560
24,400
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $970 | $480 |
$185
2,900
kWh
|
$30
-
kW-mo/yr
|
$755 | |
10 | 2.4314: Use synthetic lubricant | $645 | - |
$505
7,930
kWh
|
$140
-
kW-mo/yr
|
- | |
11 | 2.7124: Make a practice of turning off lights when not needed | $310 | $190 |
$240
3,780
kWh
|
$70
-
kW-mo/yr
|
- | |
12 | 2.7124: Make a practice of turning off lights when not needed | $270 | - |
$270
4,230
kWh
|
- | - | |
TOTAL RECOMMENDED | $68,875 | $50,967 |
$56,930
888,690
kWh
|
$11,190
-
kW-mo/yr
|
$755 | ||
TOTAL IMPLEMENTED | $59,630 | $32,562 |
$48,960
764,010
kWh
|
$10,670
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs