Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Yarns
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2284: Thread Mills
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area 285,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 7,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,468,314 38,020,000
kWh
Electricity Demand $730,912 75,002
kW-mo/yr
Natural Gas $12,720 1,632
MMBtu
TOTAL YEARLY COSTS $2,211,946
RECOMMENDED SAVINGS* $204,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $204,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $49,355 $165,749 $26,632
689,957
kWh
$11,829
-
kW-mo/yr
- $10,894
02 2.7135: Install occupancy sensors $566 $894 $566
14,653
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,681 $200 $5,804
150,360
kWh
$2,077
-
kW-mo/yr
$(-100.0) $(-100.0)
04 2.4239: Eliminate or reduce compressed air usage $241 $675 $241
6,255
kWh
- - -
05 2.4224: Upgrade controls on compressors $7,353 $15,000 $5,415
140,280
kWh
$1,938
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $8,597 $100 $6,330
164,000
kWh
$2,267
-
kW-mo/yr
- -
07 2.7241: Install outside air damper / economizer on hvac unit $100,563 $75,000 $100,563
2,605,265
kWh
- - -
08 2.2623: Minimize condenser cooling water temperature $29,926 $2,000 $29,926
775,296
kWh
- - -
TOTAL RECOMMENDED $204,282 $259,618 $175,477
4,546,066
kWh
$18,111
-
kW-mo/yr
$(-100.0) $10,794
TOTAL IMPLEMENTED $204,282 $259,618 $175,477
4,546,066
kWh
$18,111
-
kW-mo/yr
$(-100.0) $10,794
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs