Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

516

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dyeing and finishing textiles, except wool fabrics
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0051 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $14,236 $3,200
NC0051 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $3,206 $1,960
NC0051 #04 Y:1995 Use most efficient type of electric motors $6,438 $4,430
NC0051 #03 Y:1995 Turn off equipment during breaks, reduce operating time $6,450 $12,000
NC0051 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,978 $420
NC0051 #01 Y:1995 Install compressor air intakes in coolest locations $2,276 $570
UL0118 #08 Y:1994 Use a less expensive method of waste removal $2,800 $5,000
UL0118 #07 Y:1994 Treat and reuse rinse waters $33,500 $10,500
UL0118 #06 Y:1994 Meter waste water $24,300 $1,000
UL0118 #05 Y:1994 Optimize plant power factor $24,960 $12,260
UL0118 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,879 $1,583
UL0118 #03 Y:1994 Use most efficient type of electric motors $5,551 $4,400
UL0118 #02 Y:1994 Install compressor air intakes in coolest locations $586 $10
UL0118 #01 Y:1994 Analyze flue gas for proper air/fuel ratio $20,589 $2,000
UL0117 #10 Y:1994 Remove sludge from tanks on a regular basis $3,600 $5,000
UL0117 #09 Y:1994 Install equipment (eg compactor) to reduce disposal costs $1,660 $1,000
UL0117 #08 Y:1994 Install equipment (eg compactor) to reduce disposal costs $3,100 $5,000
UL0117 #07 Y:1994 Treat and reuse rinse waters $70,000 $8,000
UL0117 #06 Y:1994 Meter waste water $8,000 $1,000
UL0117 #05 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,993 $2,077