Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

516

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dyeing and finishing textiles, except wool fabrics
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0408 #06 Y:1997 Meter recycled water (to reduce sewer charges) $1,487 $2,675
MA0408 #05 Y:1997 Install compressor air intakes in coolest locations $1,735 $100
MA0408 #04 Y:1997 Use magnetic technology to treat water $2,939 $5,520
MA0408 #03 Y:1997 Replace electrically-operated equipment with fossil fuel equipment $2,188 $1,000
MA0408 #02 Y:1997 Use adjustable frequency drive or multiple speed motors on existing system $7,625 $8,625
MA0408 #01 Y:1997 Preheat combustion air with waste heat $99,832 $87,100
MA0405 #08 Y:1997 Preheat combustion air with waste heat $531 $600
MA0405 #07 Y:1997 Minimize water usage $1,049 $2,125
MA0405 #06 Y:1997 Install occupancy sensors $1,335 $1,620
MA0405 #05 Y:1997 Optimize plant power factor $2,412 $5,275
MA0405 #04 Y:1997 Install compressor air intakes in coolest locations $2,631 $266
MA0405 #03 Y:1997 Use adjustable frequency drive or multiple speed motors on existing system $12,177 $28,900
MA0405 #02 Y:1997 Minimize water usage $25,165 $3,413
MA0405 #01 Y:1997 Change rate schedules or other changes in utility service $110,455 $131,100
UL0186 #06 Y:1997 Clear and rent existing space $1,880,000 -
UL0186 #05 Y:1997 Improved material handling (mixing and transfer) $2,560 $600
UL0186 #04 Y:1997 Meter waste water $53,265 $4,500
UL0186 #03 Y:1997 Install compressor air intakes in coolest locations $2,550 $30
UL0186 #02 Y:1997 Use most efficient type of electric motors $2,928 $20,490
UL0186 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $362 $200