Assessment Year 1997
Principal Product screen printing
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 120,000
ft2
Annual Production 165,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,802 4,058,031
kWh
Electricity Demand $69,866 9,746
kW-mo/yr
Natural Gas $296,061 56,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.8114: Change rate schedules or other changes in utility service $110,455 $131,100 - - $110,455 -
02 3.4151: Minimize water usage $25,165 $3,413 - - - $25,165
-
Tgal
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,177 $28,900 $12,177
129,543
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $2,631 $266 $2,631
26,084
kWh
- - -
05 2.3212: Optimize plant power factor $2,412 $5,275 - - $2,412 -
06 2.7135: Install occupancy sensors $1,335 $1,620 $1,335
17,878
kWh
- - -
07 3.4151: Minimize water usage $1,049 $2,125 - - - $1,049
-
Tgal
08 2.2442: Preheat combustion air with waste heat $531 $600 - $531
-
MMBtu
- -
TOTAL RECOMMENDED $155,755 $173,299 $16,143
173,505
kWh
$531
-
MMBtu
$112,867 $26,214
-
Tgal
TOTAL IMPLEMENTED $38,677 $33,933 $13,512
147,421
kWh
- - $25,165
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs