Assessment Year | 1997 |
---|---|
Principal Product | screen printing |
NAICS |
n/a
|
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
120,000
ft2
|
Annual Production | 165,000
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Rhode Island |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $316,802 | 4,058,031 |
kWh
|
$0.078 |
Electricity Demand | $69,866 | 9,746 |
kW-mo/yr
|
$7.17 |
Natural Gas | $296,061 | 56,588 |
MMBtu
|
$5.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $155,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,677 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $110,455 | $131,100 | - | - | $110,455 | - | |
02 | 3.4151: Minimize water usage | $25,165 | $3,413 | - | - | - |
$25,165
-
Tgal
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,177 | $28,900 |
$12,177
129,543
kWh
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $2,631 | $266 |
$2,631
26,084
kWh
|
- | - | - | |
05 | 2.3212: Optimize plant power factor | $2,412 | $5,275 | - | - | $2,412 | - | |
06 | 2.7135: Install occupancy sensors | $1,335 | $1,620 |
$1,335
17,878
kWh
|
- | - | - | |
07 | 3.4151: Minimize water usage | $1,049 | $2,125 | - | - | - |
$1,049
-
Tgal
|
|
08 | 2.2442: Preheat combustion air with waste heat | $531 | $600 | - |
$531
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $155,755 | $173,299 |
$16,143
173,505
kWh
|
$531
-
MMBtu
|
$112,867 |
$26,214
-
Tgal
|
||
TOTAL IMPLEMENTED | $38,677 | $33,933 |
$13,512
147,421
kWh
|
- | - |
$25,165
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs