ITAC Assessment: IC0176
ITAC logo
ITAC Assessment: IC0176
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Corrugated Boxes
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 132,000
ft2
Annual Production 409,918
thousand feet
Production Hrs. Annual 4,352
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,205 1,017,000
kWh
Electricity Demand $87,966 6,732
kW-mo/yr
Natural Gas $15,018 1,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,577 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $317 $1,315 $188
3,120
kWh
$129
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,215 $441 $361
3,508
kWh
$63
-
kW-mo/yr
- - $256 $535
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,067 $1,035 $1,067
10,357
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $880 $519 $652
6,336
kWh
$228
-
kW-mo/yr
- - - -
05 2.7224: Reduce space conditioning during non-working hours $858 - - - $858
-
MMBtu
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,358 $5,900 $5,642
94,030
kWh
$2,771
-
kW-mo/yr
$(-1,055.0)
-
MMBtu
- - -
07 2.1321: Replace fossil fuel equipment with electrical equipment $8,677 $40,071 $(-917.0)
(-15,276)
kWh
$(-333.0)
-
kW-mo/yr
- $9,298
-
MMBtu
$629 -
08 2.6211: Conserve energy by efficient use of vending machines $205 - $175
1,700
kWh
$30
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $20,577 $49,281 $7,168
103,775
kWh
$2,888
-
kW-mo/yr
$(-197.0)
-
MMBtu
$9,298
-
MMBtu
$885 $535
TOTAL IMPLEMENTED $9,949 $41,106 $325
(-3,219)
kWh
$(-303.0)
-
kW-mo/yr
- $9,298
-
MMBtu
$629 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs