ITAC Assessment: MA0408
ITAC logo
ITAC Assessment: MA0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product screen printing
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 250,000
ft2
Annual Production 156,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,086 3,568,875
kWh
Electricity Demand $65,027 9,746
kW-mo/yr
Natural Gas $289,854 55,908
MMBtu
Fuel Oil #6 $23,616 7,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Other Liquid (haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.2442: Preheat combustion air with waste heat $99,832 $87,100 - - $99,832
-
MMBtu
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,625 $8,625 $7,625
91,442
kWh
- - - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,188 $1,000 $2,664
31,946
kWh
- - $(-476.0)
-
MMBtu
- - -
04 3.4145: Use magnetic technology to treat water $2,939 $5,520 - - - - $2,939
-
gal
- -
05 2.4221: Install compressor air intakes in coolest locations $1,735 $100 $1,735
20,809
kWh
- - - - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $1,487 $2,675 - - - - - $1,487 -
07 2.2511: Insulate bare equipment $644 $513 - - - $644
-
MMBtu
- - -
08 3.3128: Utilize other methods to remove contaminants $27,232 $250,000 $37,320
447,538
kWh
$5,074
-
kW-mo/yr
$(-24,399.0)
-
MMBtu
- - - $9,237
-
Tgal
TOTAL RECOMMENDED $143,682 $355,533 $49,344
591,735
kWh
$5,074
-
kW-mo/yr
$75,433
-
MMBtu
$168
-
MMBtu
$2,939
-
gal
$1,487 $9,237
-
Tgal
TOTAL IMPLEMENTED $31,799 $251,613 $41,719
500,293
kWh
$5,074
-
kW-mo/yr
$(-24,399.0)
-
MMBtu
$168
-
MMBtu
- - $9,237
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Other Liquid (haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs