90
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Lace and warp knit fabric mills | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SU0559 #10 Y:2024 | 10 | 2024 | Adjust / maintain fork lift trucks for most efficient operation | $12,034 | $165,150 |
n/a
|
SU0559 #09 Y:2024 | 09 | 2024 | Use heat pump for space conditioning | $175,181 | $421,500 |
n/a
|
SU0559 #08 Y:2024 | 08 | 2024 | Conserve energy by efficient use of vending machines | $577 | $888 |
n/a
|
SU0559 #07 Y:2024 | 07 | 2024 | Install or upgrade insulation on hvac distribution systems | $37,111 | $44,118 |
n/a
|
SU0559 #06 Y:2024 | 06 | 2024 | Replace existing hvac unit with high efficiency model | $3,988 | $4,574 |
n/a
|
SU0559 #05 Y:2024 | 05 | 2024 | Install / repair insulation on steam lines | $5,926 | $3,523 |
n/a
|
SU0559 #04 Y:2024 | 04 | 2024 | Install vinyl strip / high speed / air curtain doors | $662 | $307 |
n/a
|
SU0559 #03 Y:2024 | 03 | 2024 | Apply for tax-free status for energy purchases | $498 | $27 |
n/a
|
SU0559 #02 Y:2024 | 02 | 2024 | Use or replace with energy efficient substitutes | $519 | $27 |
n/a
|
SU0559 #01 Y:2024 | 01 | 2024 | Pay bills on time to avoid late fees | $1,057 | - |
n/a
|
NC0300 #05 Y:2004 | 05 | 2004 | Install occupancy sensors | $1,402 | $4,751 | |
NC0300 #04 Y:2004 | 04 | 2004 | Utilize higher efficiency lamps and/or ballasts | $3,688 | $6,890 | |
NC0300 #03 Y:2004 | 03 | 2004 | Turn off equipment when not in use | $9,308 | $100 | |
NC0300 #02 Y:2004 | 02 | 2004 | Install outside air damper / economizer on hvac unit | $2,558 | $5,000 | |
NC0300 #01 Y:2004 | 01 | 2004 | Chill water to the highest temperature possible | $1,985 | $1,000 | |
NC0285 #08 Y:2004 | 08 | 2004 | Reduce the pressure of compressed air to the minimum required | $1,454 | $500 | |
NC0285 #07 Y:2004 | 07 | 2004 | Install outside air damper / economizer on hvac unit | $11,507 | $23,675 | |
NC0285 #06 Y:2004 | 06 | 2004 | Adjust burners for efficient operation | $9,991 | $1,000 | |
NC0285 #05 Y:2004 | 05 | 2004 | Use waste heat from hot flue gases to preheat | $48,918 | $20,000 | |
NC0285 #04 Y:2004 | 04 | 2004 | Use flow control valves on equipment to optimize water use | $956 | $1,380 |