ITAC Assessment: NC0300
ITAC logo
ITAC Assessment: NC0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Knit elastic fabric
NAICS 313240: Knit Fabric Mills
SIC 2258: Lace and Warp Knit Fabric Mills
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 120,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,181 9,045,360
kWh
Electricity Demand $251,714 17,395
kW-mo/yr
Electricity Fees $18,869 -
Fuel Oil #6 $268,333 46,419
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,268

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2625: Chill water to the highest temperature possible $1,985 $1,000 $488
17,475
kWh
$1,497
-
kW-mo/yr
02 2.7241: Install outside air damper / economizer on hvac unit $2,558 $5,000 $2,558
116,946
kWh
-
03 2.6218: Turn off equipment when not in use $9,308 $100 $5,475
196,224
kWh
$3,833
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,688 $6,890 $1,730
62,010
kWh
$1,958
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,402 $4,751 $1,320
47,326
kWh
$82
-
kW-mo/yr
TOTAL RECOMMENDED $18,941 $17,741 $11,571
439,981
kWh
$7,370
-
kW-mo/yr
TOTAL IMPLEMENTED $13,268 $9,851 $9,353
360,496
kWh
$3,915
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs