ITAC Assessment: LE0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Triglycerides
NAICS 311225: Fats and Oils Refining and Blending
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 64
Plant Area 150,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,674 6,319,544
kWh
Electricity Demand $104,962 11,764
kW-mo/yr
Electricity Fees $80,856 -
Natural Gas $1,583,931 308,602
MMBtu
TOTAL YEARLY COSTS $2,173,423
RECOMMENDED SAVINGS* $190,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $16,565 $11,000 $13,903
217,235
kWh
$2,662
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $841 $1,040 $841
13,140
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,247 $36,000 $22,811
356,422
kWh
$4,436
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,521 $9,000 $4,634
72,411
kWh
$887
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $1,080 $1,908 - - $1,080
-
MMBtu
06 2.2442: Preheat combustion air with waste heat $11,386 $45,000 $1,080
16,883
kWh
- $10,306
-
MMBtu
07 2.2442: Preheat combustion air with waste heat $128,214 $580,000 - - $128,214
-
MMBtu
TOTAL RECOMMENDED $190,854 $683,948 $43,269
676,091
kWh
$7,985
-
kW-mo/yr
$139,600
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs