Assessment Year | 2023 |
---|---|
Principal Product | Triglycerides |
NAICS | 311225: Fats and Oils Refining and Blending |
SIC | 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 64 |
Plant Area |
150,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 8,600
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $403,674 | 6,319,544 |
kWh
|
$0.064 |
Electricity Demand | $104,962 | 11,764 |
kW-mo/yr
|
$8.92 |
Electricity Fees | $80,856 | - |
|
- |
Natural Gas | $1,583,931 | 308,602 |
MMBtu
|
$5.13 |
TOTAL YEARLY COSTS | $2,173,423 | |||
RECOMMENDED SAVINGS* | $190,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $16,565 | $11,000 |
$13,903
217,235
kWh
|
$2,662
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $841 | $1,040 |
$841
13,140
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,247 | $36,000 |
$22,811
356,422
kWh
|
$4,436
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,521 | $9,000 |
$4,634
72,411
kWh
|
$887
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $1,080 | $1,908 | - | - |
$1,080
-
MMBtu
|
|
06 | 2.2442: Preheat combustion air with waste heat | $11,386 | $45,000 |
$1,080
16,883
kWh
|
- |
$10,306
-
MMBtu
|
|
07 | 2.2442: Preheat combustion air with waste heat | $128,214 | $580,000 | - | - |
$128,214
-
MMBtu
|
|
TOTAL RECOMMENDED | $190,854 | $683,948 |
$43,269
676,091
kWh
|
$7,985
-
kW-mo/yr
|
$139,600
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs