ITAC Assessment: OR0362
ITAC logo
ITAC Assessment: OR0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Particle Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 250,000
ft2
Annual Production 190,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,575,699 66,403,577
kWh
Electricity Demand $452,914 1,278,816
kW-mo/yr
Electricity Fees $300 -
Natural Gas $834,866 265,323
MMBtu
LPG $26,361 3,835
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,343,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $538,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Primary Product Savings
01 4.126: Install sensors to detect defects $201,600 $113,500 - - - - $201,600 -
02 4.421: Modify current incentive program $337,500 $66,400 - - - - $337,500 -
03 4.125: $12,680 $7,950 - - - - $(-16,800.0) $29,480
04 4.611: Begin a practice of predictive / preventative maintenance $324,000 $4,700 - - - - - $324,000
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $45,360 $89,325 $38,490
992,087
kWh
$6,870
-
kW-mo/yr
- - - -
06 2.1332: Convert combustion equipment to burn natural gas $13,220 $94,000 $(-700.0)
(-17,878)
kWh
$(-360.0)
-
kW-mo/yr
$(-12,080.0)
-
MMBtu
$26,360
-
MMBtu
- -
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $409,580 $6,890,000 $2,133,310
54,998,242
kWh
$322,000
-
kW-mo/yr
$(-1,221,000.0)
-
MMBtu
- $(-824,730.0) -
TOTAL RECOMMENDED $1,343,940 $7,265,875 $2,171,100
55,972,451
kWh
$328,510
-
kW-mo/yr
$(-1,233,080.0)
-
MMBtu
$26,360
-
MMBtu
$(-302,430.0) $353,480
TOTAL IMPLEMENTED $538,280 $126,150 - - - - $184,800 $353,480
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs