Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

532

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Knitting mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0559 #10 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $12,034 $165,150
SU0559 #09 Y:2024 Use heat pump for space conditioning $175,181 $421,500
SU0559 #08 Y:2024 Conserve energy by efficient use of vending machines $577 $888
SU0559 #07 Y:2024 Install or upgrade insulation on hvac distribution systems $37,111 $44,118
SU0559 #06 Y:2024 Replace existing hvac unit with high efficiency model $3,988 $4,574
SU0559 #05 Y:2024 Install / repair insulation on steam lines $5,926 $3,523
SU0559 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $662 $307
SU0559 #03 Y:2024 Apply for tax-free status for energy purchases $498 $27
SU0559 #02 Y:2024 Use or replace with energy efficient substitutes $519 $27
SU0559 #01 Y:2024 Pay bills on time to avoid late fees $1,057 -
CC0014 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $34,932 $53,322
CC0014 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $10,695 $11,000
CC0014 #05 Y:2023 Insulate bare equipment $41,841 $26,106
CC0014 #04 Y:2023 Turn off equipment when not in use $6,527 $2,000
CC0014 #03 Y:2023 Turn off equipment when not in use $4,768 $1,000
CC0014 #02 Y:2023 Use computer programs to optimize hvac performance $7,788 $800
CC0014 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,512 $1,000
NC0666 #04 Y:2021 Use heat from boiler blowdown to preheat boiler feed water $4,768 $10,000
NC0666 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $2,259 $50
NC0666 #02 Y:2021 Size electric motors for peak operating efficiency $24,876 $50,000