Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Broadwoven fabric mills, manmade fiber and silk
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ME0208 #10 Y:1996 Meter recycled water (to reduce sewer charges) $143 $400
ME0208 #09 Y:1996 Consider use / purchase of bulk materials where possible $24,276 $6,900
ME0208 #08 Y:1996 Change product design to reduce energy requirements $354 -
ME0208 #07 Y:1996 Apply for tax-free status for energy purchases $452 -
ME0208 #06 Y:1996 Install compressor air intakes in coolest locations $738 $200
ME0208 #05 Y:1996 Use optimum thickness insulation $788 $290
ME0208 #04 Y:1996 Pay utility bills on time $1,220 -
ME0208 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,949 $3,274
ME0208 #02 Y:1996 Reduce the pressure of compressed air to the minimum required $2,766 $20
ME0208 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $3,030 $600
TN0598 #09 Y:1996 Recover waste heat from equipment $2,196 $4,750
TN0598 #08 Y:1996 Reduce illumination to minimum necessary levels $4,530 $9,800
TN0598 #07 Y:1996 Use a less expensive method of waste removal $5,900 -
TN0598 #06 Y:1996 Use computer programs to optimize hvac performance $7,685 $13,600
TN0598 #05 Y:1996 Use computer programs to optimize hvac performance $30,661 $92,600
TN0598 #04 Y:1996 Optimize production lot sizes and inventories $33,035 $13,000
TN0598 #03 Y:1996 Modify current incentive program $59,900 $10,000
TN0598 #02 Y:1996 Recover and reuse waste material $95,500 $12,800
TN0598 #01 Y:1996 Reduce scrap production $151,000 $13,920
OD0059 #08 Y:1996 Burn waste oil for heat $4,117 $4,335