ITAC Assessment: ME0208
ITAC logo
ITAC Assessment: ME0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Composite Materials
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 7,696
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,452 819,754
kWh
Electricity Demand $16,005 2,014
kW-mo/yr
Electricity Fees $3,399 -
LPG $13,679 1,704
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,030 $600 $3,030
43,376
kWh
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,766 $20 $2,766
39,566
kWh
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,949 $3,274 $1,949
27,843
kWh
- - - - -
04 2.8123: Pay utility bills on time $1,220 - - - - - $1,220 -
05 2.2515: Use optimum thickness insulation $788 $290 $788
11,137
kWh
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $738 $200 $738
10,551
kWh
- - - - -
07 2.8121: Apply for tax-free status for energy purchases $452 - - - - - $452 -
08 2.5195: Change product design to reduce energy requirements $354 - $217
2,931
kWh
$137
-
kW-mo/yr
- - - -
09 4.211: Consider use / purchase of bulk materials where possible $24,276 $6,900 - - - $131
-
lb
- $24,145
10 3.4116: Meter recycled water (to reduce sewer charges) $143 $400 - - $143
-
Tgal
- - -
TOTAL RECOMMENDED $35,716 $11,684 $9,488
135,404
kWh
$137
-
kW-mo/yr
$143
-
Tgal
$131
-
lb
$1,672 $24,145
TOTAL IMPLEMENTED $32,675 $8,210 $6,584
94,079
kWh
- $143
-
Tgal
$131
-
lb
$1,672 $24,145
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs