ITAC Assessment: OD0059
ITAC logo
ITAC Assessment: OD0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Upholstery and curtain fabrics
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 135,000
ft2
Annual Production 45,000,000
thousand feet
Production Hrs. Annual 5,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,042 6,418,230
kWh
Electricity Demand $166,972 12,510
kW-mo/yr
Electricity Fees $28,780 -
LPG $8,661 739
MMBtu
Fuel Oil #6 $49,296 10,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,143 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,899 $1,600 $1,899
93,200
kWh
- - - -
02 2.4133: Use most efficient type of electric motors $949 $2,562 $402
19,637
kWh
$547
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,319 $1,285 $558
27,257
kWh
$761
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $297 $200 $297
14,654
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,841 $13,842 $5,441
266,706
kWh
$8,400
-
kW-mo/yr
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,287 $1,495 - - - $3,287
-
MMBtu
-
07 2.7132: Install timers on light switches in little used areas $1,434 $423 $1,434
34,584
kWh
- - - -
08 3.6124: Burn waste oil for heat $4,117 $4,335 - - $4,067
-
MMBtu
- $50
-
gal
TOTAL RECOMMENDED $27,143 $25,742 $10,031
456,038
kWh
$9,708
-
kW-mo/yr
$4,067
-
MMBtu
$3,287
-
MMBtu
$50
-
gal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #6 Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs