ITAC Assessment: GT0684
ITAC logo
ITAC Assessment: GT0684
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Surgical Instruments
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 40,000
ft2
Annual Production 84,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,984 922,919
kWh
Electricity Demand $55,808 3,691
kW-mo/yr
Electricity Fees $2,666 -
Natural Gas $8,116 813
MMBtu
LPG $297 52
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $5,160 - - - - $5,160
02 2.8113: Purchase gas directly from a contract gas supplier $1,325 - - - - $1,325
03 2.3137: Use power during off-peak periods $1,975 - - $1,846
-
kW-mo/yr
$129 -
04 2.7225: Close outdoor air dampers during warm-up / cool-down periods $1,632 $2,450 $227
9,086
kWh
$1,298
-
kW-mo/yr
$107 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,200 $19,600 $1,586
63,599
kWh
$6,078
-
kW-mo/yr
$536 -
TOTAL RECOMMENDED $18,292 $22,050 $1,813
72,685
kWh
$9,222
-
kW-mo/yr
$772 $6,485
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs