ITAC Assessment: GT0710
ITAC logo
ITAC Assessment: GT0710
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Polymer Colorants
NAICS
n/a
SIC 2816: Inorganic Pigments
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 50,000
ft2
Annual Production 3,360,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,904 1,424,546
kWh
Electricity Demand $51,868 4,077
kW-mo/yr
Electricity Fees $655 -
Natural Gas $7,374 1,023
MMBtu
LPG $878 158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,085 $300 $966
40,570
kWh
$992
-
kW-mo/yr
$127 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,305 $4,030 $511
21,481
kWh
$1,641
-
kW-mo/yr
$153 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $865 $2,450 $400
16,800
kWh
$407
-
kW-mo/yr
$58 - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $1,125 $3,600 $1,123
47,200
kWh
- $2 - -
05 2.4133: Use most efficient type of electric motors $1,120 $6,932 $517
21,722
kWh
$529
-
kW-mo/yr
$74 - -
06 2.1321: Replace fossil fuel equipment with electrical equipment $423 $2,100 $(-105.0)
(-4,400)
kWh
$(-320.0)
-
kW-mo/yr
$(-30.0) $878
-
MMBtu
-
07 4.652: Replace existing equipment with more suitable substitutes $156,450 $5,200 - - - - $156,450
08 2.2511: Insulate bare equipment $560 $275 $214
8,996
kWh
$312
-
kW-mo/yr
$34 - -
TOTAL RECOMMENDED $164,933 $24,887 $3,626
152,369
kWh
$3,561
-
kW-mo/yr
$418 $878
-
MMBtu
$156,450
TOTAL IMPLEMENTED $161,705 $11,980 $1,877
78,851
kWh
$3,040
-
kW-mo/yr
$338 - $156,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs