| Assessment Year | 2001 |
|---|---|
| Principal Product | Polymer Colorants |
| NAICS |
n/a
|
| SIC | 2816: Inorganic Pigments |
| Sales Range | $10 M to 50M |
| # of Employees | 32 |
| Plant Area |
50,000
ft2
|
| Annual Production | 3,360,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $33,904 | 1,424,546 |
kWh
|
$0.024 |
| Electricity Demand | $51,868 | 4,077 |
kW-mo/yr
|
$12.72 |
| Electricity Fees | $655 | - |
|
- |
| Natural Gas | $7,374 | 1,023 |
MMBtu
|
$7.21 |
| LPG | $878 | 158 |
MMBtu
|
$5.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $164,933 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $161,705 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,085 | $300 |
$966
40,570
kWh
|
$992
-
kW-mo/yr
|
$127 | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,305 | $4,030 |
$511
21,481
kWh
|
$1,641
-
kW-mo/yr
|
$153 | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $865 | $2,450 |
$400
16,800
kWh
|
$407
-
kW-mo/yr
|
$58 | - | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,125 | $3,600 |
$1,123
47,200
kWh
|
- | $2 | - | - | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,120 | $6,932 |
$517
21,722
kWh
|
$529
-
kW-mo/yr
|
$74 | - | - | |
| 06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $423 | $2,100 |
$(-105.0)
(-4,400)
kWh
|
$(-320.0)
-
kW-mo/yr
|
$(-30.0) |
$878
-
MMBtu
|
- | |
| 07 | 4.652: Replace existing equipment with more suitable substitutes | $156,450 | $5,200 | - | - | - | - | $156,450 | |
| 08 | 2.2511: Insulate bare equipment | $560 | $275 |
$214
8,996
kWh
|
$312
-
kW-mo/yr
|
$34 | - | - | |
| TOTAL RECOMMENDED | $164,933 | $24,887 |
$3,626
152,369
kWh
|
$3,561
-
kW-mo/yr
|
$418 |
$878
-
MMBtu
|
$156,450 | ||
| TOTAL IMPLEMENTED | $161,705 | $11,980 |
$1,877
78,851
kWh
|
$3,040
-
kW-mo/yr
|
$338 | - | $156,450 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs