52
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0230 #08 Y:2019 | 08 | 2019 | Install timers and/or thermostats | $289 | $20 | |
TT0230 #07 Y:2019 | 07 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $2,661 | $1,618 | |
TT0230 #06 Y:2019 | 06 | 2019 | Use waste heat from hot flue gases to generate steam | $2,786 | $10,000 | |
TT0230 #05 Y:2019 | 05 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,238 | $3,200 | |
TT0230 #04 Y:2019 | 04 | 2019 | Use heat from boiler blowdown to preheat boiler feed water | $6,630 | $30,000 | |
TT0230 #03 Y:2019 | 03 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $8,935 | $39,040 | |
TT0230 #02 Y:2019 | 02 | 2019 | Analyze flue gas for proper air/fuel ratio | $13,000 | $6,000 | |
TT0230 #01 Y:2019 | 01 | 2019 | Use a less expensive method of waste removal | $37,500 | - | |
TT0218 #10 Y:2018 | 10 | 2018 | Eliminate/reduce an operation | $798 | $340 | |
TT0218 #09 Y:2018 | 09 | 2018 | Insulate bare equipment | $1,202 | $2,400 | |
TT0218 #08 Y:2018 | 08 | 2018 | Use heat from boiler blowdown to preheat boiler feed water | $2,058 | $4,500 | |
TT0218 #07 Y:2018 | 07 | 2018 | Analyze flue gas for proper air/fuel ratio | $3,000 | $2,000 | |
TT0218 #06 Y:2018 | 06 | 2018 | Change rate schedules or other changes in utility service | $3,670 | $200 | |
TT0218 #05 Y:2018 | 05 | 2018 | Increase amount of condensate returned | $5,090 | $15,000 | |
TT0218 #04 Y:2018 | 04 | 2018 | Upgrade controls on compressors | $20,301 | $8,000 | |
TT0218 #03 Y:2018 | 03 | 2018 | Use cooling tower or economizer to replace chiller cooling | $20,902 | $30,000 | |
TT0218 #02 Y:2018 | 02 | 2018 | Meter recycled water (to reduce sewer charges) | $21,004 | $2,150 | |
TT0218 #01 Y:2018 | 01 | 2018 | Utilize higher efficiency lamps and/or ballasts | $21,090 | $85,313 | |
TT0152 #08 Y:2014 | 08 | 2014 | Use or replace with energy efficient substitutes | $2,434 | $18,270 | |
TT0152 #07 Y:2014 | 07 | 2014 | Install occupancy sensors | $2,460 | $10,150 |