ITAC Assessment: TT0218
ITAC logo
ITAC Assessment: TT0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Smokeless Tobacco
NAICS 312230: Tobacco Manufacturing
SIC 2131: Chewing and Smoking Tobacco and Snuff
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 787,000
ft2
Annual Production 11,232
units
Production Hrs. Annual 4,335
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $640,862 12,039,000
kWh
Electricity Demand $363,765 30,041
kW-mo/yr
Natural Gas $173,449 38,679
MMBtu
Waste Disposal Costs
Water Usage $37,731 21,804
Tgal
Water Disposal $54,713 21,803
Tgal
TOTAL YEARLY COSTS $1,270,520
RECOMMENDED SAVINGS* $99,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,090 $85,313 $7,793
146,484
kWh
$4,916
-
kW-mo/yr
- - - $8,381 -
02 3.4116: Meter recycled water (to reduce sewer charges) $21,004 $2,150 - - - - $21,004
-
Tgal
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $20,902 $30,000 $20,902
392,897
kWh
- - - - - -
04 2.4224: Upgrade controls on compressors $20,301 $8,000 $12,454
234,090
kWh
$7,847
-
kW-mo/yr
- - - - -
05 2.2121: Increase amount of condensate returned $5,090 $15,000 - - $3,870
-
MMBtu
$1,220
-
Tgal
- - -
06 2.8114: Change rate schedules or other changes in utility service $3,670 $200 - - - - - - $3,670
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,000 $2,000 - - $3,000
-
MMBtu
- - - -
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,058 $4,500 - - $2,058
-
MMBtu
$0
-
Tgal
- - -
09 2.2511: Insulate bare equipment $1,202 $2,400 - - $1,202
-
MMBtu
- - - -
10 3.1161: Eliminate/reduce an operation $798 $340 $798
14,999
kWh
- - - - - -
TOTAL RECOMMENDED $99,115 $149,903 $41,947
788,470
kWh
$12,763
-
kW-mo/yr
$10,130
-
MMBtu
$1,220
-
Tgal
$21,004
-
Tgal
$8,381 $3,670
TOTAL IMPLEMENTED $55,854 $107,403 $8,591
161,483
kWh
$4,916
-
kW-mo/yr
$8,072
-
MMBtu
$1,220
-
Tgal
$21,004
-
Tgal
$8,381 $3,670
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs