ITAC Assessment: IA0023
ITAC logo
ITAC Assessment: IA0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FROZEN VEGETABLES
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 4,296
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $861,190 12,551,876
kWh
Natural Gas $20,852 5,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $453,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $136,664 $13,000 n/a $136,664
1,991,794
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,994 $16 n/a $1,994
29,015
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,957 $1,480 n/a $4,715
68,581
kWh
- $(-1,758.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,986 $8,825 n/a $3,986
58,030
kWh
- -
05 2.6232: Install set-back timers $1,114 $1,188 n/a $1,114
16,120
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,709 $8,000 n/a $1,709
24,912
kWh
- -
07 2.3212: Optimize plant power factor $94,150 $84,875 n/a $94,150
-
kWh
- -
08 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $211,326 $1 n/a $485,573
7,806,858
kWh
$(-157,145.0)
-
MMBtu
$(-117,102.0)
TOTAL RECOMMENDED $453,900 $117,385 $729,905
9,995,310
kWh
$(-157,145.0)
-
MMBtu
$(-118,860.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs