Assessment Year | 2015 |
---|---|
Principal Product | Tobacco |
NAICS | 312230: Tobacco Manufacturing |
SIC | 2131: Chewing and Smoking Tobacco and Snuff |
Sales Range | $100 M to 500M |
# of Employees | 185 |
Plant Area |
868,869
ft2
|
Annual Production | 2,335,880
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $933,098 | 14,609,979 |
kWh
|
$0.064 |
Electricity Demand | $695,942 | 108,817 |
kW-mo/yr
|
$6.40 |
Natural Gas | $529,089 | 64,150 |
MMBtu
|
$8.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $231,466 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $224,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $201,140 | $630,000 |
$144,602
2,259,400
kWh
|
$41,538
-
kW-mo/yr
|
$15,000 | |
02 | 2.4224: Upgrade controls on compressors | $8,575 | $15,201 |
$7,854
122,720
kWh
|
$721
-
kW-mo/yr
|
- | |
03 | 2.4224: Upgrade controls on compressors | $6,816 | $2,400 |
$6,816
106,500
kWh
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $4,596 | $3,734 |
$2,344
36,619
kWh
|
$2,252
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,838 | $1,800 |
$1,265
19,764
kWh
|
$173
-
kW-mo/yr
|
$1,400 | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,606 | $109 |
$2,606
40,719
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $2,460 | $10,150 |
$2,460
38,445
kWh
|
- | - | |
08 | 2.4322: Use or replace with energy efficient substitutes | $2,434 | $18,270 |
$2,434
38,037
kWh
|
- | - | |
TOTAL RECOMMENDED | $231,466 | $681,664 |
$170,382
2,662,203
kWh
|
$44,684
-
kW-mo/yr
|
$16,400 | ||
TOTAL IMPLEMENTED | $224,264 | $677,821 |
$165,432
2,584,865
kWh
|
$42,432
-
kW-mo/yr
|
$16,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs