ITAC Assessment: TT0230
ITAC logo
ITAC Assessment: TT0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Moist and Dry Snuff
NAICS 312230: Tobacco Manufacturing
SIC 2131: Chewing and Smoking Tobacco and Snuff
Sales Range $100
M
to 500
M
# of Employees 153
Plant Area 843,581
ft2
Annual Production 35,765,716
units
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $859,271 14,547,840
kWh
Electricity Demand $342,844 37,335
kW-mo/yr
Natural Gas $298,525 40,116
MMBtu
Waste Disposal Costs
Water Usage $93,750 7,809
Tgal
Water Disposal $38,620 7,809
Tgal
Solid Waste (non-haz) $37,500 1,500,000
lb
TOTAL YEARLY COSTS $1,670,510
RECOMMENDED SAVINGS* $78,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.6192: Use a less expensive method of waste removal $37,500 - - - - $37,500
-
lb
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,000 $6,000 - - $13,000
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,935 $39,040 $8,935
151,190
kWh
- - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $6,630 $30,000 - - $6,630
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,238 $3,200 $5,187
87,770
kWh
$1,051
-
kW-mo/yr
- -
06 2.2422: Use waste heat from hot flue gases to generate steam $2,786 $10,000 - - $2,786
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,661 $1,618 $2,661
44,492
kWh
- - -
08 2.7261: Install timers and/or thermostats $289 $20 $289
4,892
kWh
- - -
TOTAL RECOMMENDED $78,039 $89,878 $17,072
288,344
kWh
$1,051
-
kW-mo/yr
$22,416
-
MMBtu
$37,500
-
lb
TOTAL IMPLEMENTED $55,623 $43,878 $17,072
288,344
kWh
$1,051
-
kW-mo/yr
- $37,500
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs