Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tobacco products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0412 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $40,422 $1,980
MI0412 #04 Y:2022 Replace electrically-operated equipment with fossil fuel equipment $2,603 $6,042
MI0412 #03 Y:2022 Do not use compressed air for personal cooling $9,634 $2,055
MI0412 #02 Y:2022 Eliminate/reduce an operation $73,444 $22,400
MI0412 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $126,797 $24,547
TT0230 #08 Y:2019 Install timers and/or thermostats $289 $20
TT0230 #07 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $2,661 $1,618
TT0230 #06 Y:2019 Use waste heat from hot flue gases to generate steam $2,786 $10,000
TT0230 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $6,238 $3,200
TT0230 #04 Y:2019 Use heat from boiler blowdown to preheat boiler feed water $6,630 $30,000
TT0230 #03 Y:2019 Utilize energy-efficient belts and other improved mechanisms $8,935 $39,040
TT0230 #02 Y:2019 Analyze flue gas for proper air/fuel ratio $13,000 $6,000
TT0230 #01 Y:2019 Use a less expensive method of waste removal $37,500 -
TT0218 #10 Y:2018 Eliminate/reduce an operation $798 $340
TT0218 #09 Y:2018 Insulate bare equipment $1,202 $2,400
TT0218 #08 Y:2018 Use heat from boiler blowdown to preheat boiler feed water $2,058 $4,500
TT0218 #07 Y:2018 Analyze flue gas for proper air/fuel ratio $3,000 $2,000
TT0218 #06 Y:2018 Change rate schedules or other changes in utility service $3,670 $200
TT0218 #05 Y:2018 Increase amount of condensate returned $5,090 $15,000
TT0218 #04 Y:2018 Upgrade controls on compressors $20,301 $8,000